11122
1.REPLACE INTAKE VALVE GUIDE BUSH
Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.


Using SST and a hammer, tap out the valve guide bush.
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
10.285 to 10.306 mm (0.405 to 0.406 in.)
If the bush bore diameter of the cylinder head is between 10.285 and 10.306 mm (0.405 and 0.406 in.), proceed to the next step.
If the bush bore diameter of the cylinder head is 10.356 mm (0.408 in.) or more, replace the cylinder head sub-assembly.
Select a new guide bush (STD or O/S 0.05) and measure its diameter.
Machine the bush bore of the cylinder head to the diameter of the selected guide bush.
| Bush Size | Specified Condition |
|---|---|
| STD | 10.333 to 10.344 mm (0.4068 to 0.4072 in.) |
| O/S 0.05 | 10.383 to 10.394 mm (0.4088 to 0.4092 in.) |
41.3 to 41.7 mm (1.626 to 1.642 in.)
Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).


| *1 | Protrusion Height |
Using SST and a hammer, tap in the selected guide bush to the standard protrusion height.
14.8 to 15.2 mm (0.582 to 0.598 in.)
Using a sharp 5.5 mm reamer, ream the guide bush to obtain the standard oil clearance between the guide bush and valve stem.
0.025 to 0.060 mm (0.000984 to 0.00236 in.)
11126
2.REPLACE EXHAUST VALVE GUIDE BUSH
Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.


Using SST and a hammer, tap out the valve guide bush.
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
10.285 to 10.306 mm (0.405 to 0.406 in.)
If the bush bore diameter of the cylinder head is between 10.285 and 10.306 mm (0.405 and 0.406 in.), proceed to the next step.
If the bush bore diameter of the cylinder head is 10.356 mm (0.408 in.) or more, replace the cylinder head sub-assembly.
Select a new guide bush (STD or O/S 0.05) and measure its diameter.
Machine the bush bore of the cylinder head to the diameter of the selected guide bush.
| Bush Size | Specified Condition |
|---|---|
| STD | 10.333 to 10.344 mm (0.4068 in 0.4072 in.) |
| O/S 0.05 | 10.383 to 10.394 mm (0.4088 to 0.4092 in.) |
46.8 to 47.2 mm (1.843 to 1.858 in.)
Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).


| *1 | Protrusion Height |
Using SST and a hammer, tap in the selected guide bush to the standard protrusion height.
14.2 to 14.6 mm (0.559 to 0.575 in.)
Using a sharp 5.5 mm reamer, ream the guide bush to obtain the standard oil clearance between the guide bush and valve stem.
0.030 to 0.065 mm (0.00118 to 0.00256 in.)
3.REPLACE SPARK PLUG TUBE
When using a new cylinder head, the spark plug tubes must be replaced.


| *1 | Adhesive |
| *2 | Application Width |
| *3 | Distance |
Apply adhesive onto the shaded area of a new spark plug tube.
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent.
2.0 mm (0.0787 in.)
6.0 mm (0.236 in.)
Install the spark plug tube within 3 minutes after applying adhesive.
Be careful not to deform the spark plug tube.
Be careful not to expose the seal to coolant for at least 1 hour after installing it.
| *1 | Protrusion Height |
Using a wooden block and hammer, tap in the spark plug tube to the specified protrusion height.
112 mm (4.41 in.)
To avoid tapping in the spark plug tube too far, measure the protrusion height while tapping it.
11115A
4.REPLACE RING PIN
It is not necessary to remove the ring pin unless it is being replaced.
Remove the ring pins.
| *1 | Protrusion Height |
Using a plastic-faced hammer, tap in new ring pins to the cylinder head.
6.5 to 7.5 mm (0.256 to 0.295 in.)